Project - Newcastle University, Replacement of Solar Panels

 

HAS were contacted to help with the replacement of the solar energy system at the Newcastle University site.  After a site survey it was deemed that the current roof access equipment required modifying to allow safe access for the refurbishment.

A new Uniline Unirail system was installed to allow a Industrial Rope Access Team to work in suspension to install bespoke temporary edge debris protection to the three perimeter sides and then finally remove and replace the solar system.

During the full contract duration the University site was fully operational and with careful planning and integration all works were completed on time and within budget with minimal disturbance to the students and staff.
 

 

 

 

 

 

 

 

 

 

 