| Type of Works | Area | Contract Period | | Safety netting to new roof areas by rope access | 5,000m² | 4 Weeks | | Supply of rope access rescue team | | |
http://www.mcfc.co.uk/default.sps?pagegid={042BAF79-B963-488D-8534-090ED773350C} HASL designed and installed a safety net system to the new stand area by industrial rope access, this was particularly difficult as the main structural rafters were box section making rigging and dismantling very time consuming during the winter months. ... Back to Top
|