HASL undertook the remedial works to Old Hall Street in Liverpool consisting of a structural survey to identify defective coatings to cladding panels. Once the inspection was completed HASL masked and coated the identified panels. HASL also undertook major scale window cleaning to complete works all by Industrial Rope Access. | Type of Works | Area | Contract Period | | Painting of cladding by rope access | All elevations | 4 Weeks | | Window cleaning by rope access | | | |
|
Read more...
|
|

HASL supplied and installed a bespoke WP net system for the new Waterworld Feature in Pembroke. WP nets had never before been installed onto this type of Glulam beams before. | Type of Works | Area | Contract Period | | WP net system to new roof areas by MEWPs | 4,000m² | 3 Months | | Installation of Uniline mansafe products | | | |
|
Read more...
|
|

HASL supplied and installed safety nets and edge protection systems to the new British Gypsum facility in East Leake. Rope Access methods were utilised on most of the main building as MEWPs access was unavailable to many areas. | Type of Works | Area | Contract Period | | Safety netting to roof areas by rope access and MEWPs | 7,500m² | 6 Months | | Temporary edge protection by rope access and MEWPs | 500m | | | Installation of ridge flashings by rope access | | | |
|
Read more...
|
|

HASL supplied safety nets, bespoke edge protection systems and Haki access towers to 8 units on Becton Waterfront in London. | Type of Works | Area | Contract Period | | Safety netting to new roof areas by MEWPs | 40,300m² | 9 Months | | Temporary edge protection to new roof areas by MEWPs | 2,500m | | | Haki Access Towers | 8 x 12m | | |
|
Read more...
|
|

HASL supplied safety nets, edge protection systems and Haki access towers to 4 units on the Lancashire Waste Facility Scheme. HASL designed and certified a bespoke net attachment device as the project required specialist protection for the paint system. | Type of Works | Area | Contract Period | | Safety netting to new roof areas by MEWPs | 60,800m² | 6 Months | | Temporary edge protection by MEWPs | 2,500m | | | Haki access towers | 24 x 11m | | |
|
Read more...
|
|

HASL provided safety nets, temporary edge protection systems and Haki stair towers for the new leisure centre in Dumfries. HASL also provided industrial rope access teams to undertake the remedial painting and cleaning works to the main pool areas. | Type of Works | Area | Contract Period | | Safety netting to new roof areas by rope access | 1,100m² | 3 Months | | Temporary edge protection by rope access | 30m | | | Painting & cleaning by rope access | | 2 Months | |
|
Read more...
|
|

HASL provided rope access teams to assist in the installation of the fire systems to the difficult to reach areas at the Maelor hospital in Wrexham. | Type of Works | Area | Contract Period | | Installation of fire system by rope access | Basement Level | 2 Weeks | |
|
Read more...
|
|

HASL provided rope access teams to install the new advertising signage to the main stand area. HASL also installed the advertising logos for the Westfield Health stand. | Type of Works | Area | Contract Period | | Installation of signage by rope access | Main Stand | 2 Weeks | |
|
Read more...
|
|

HASL provided rope access teams to install giant media posters at George Square in Glasgow. HASL successfully completed their works during busy rush hour periods without disruption to the general public. | Type of Works | Area | Contract Period | | Installation of giant media by rope access | 1200m² | 12 Months | |
|
Read more...
|
|
HASL provided rope access teams to install giant media posters on The Royal Mile in Edinburgh. HASL successfully completed their works during busy rush hour periods without disruption to the general public.
| Type of Works | Area | Contract Period | | Installation of giant media by rope access | 1200m² | 12 Months | |
|
Read more...
|
|
HASL provided rope access teams to install giant media posters on many various poster sites throught the UK. HASL successfully completed their works during busy rush hour periods without disruption to the general public.
| Type of Works | Contract Period | | Installation of giant media by rope access | 12 Months | |
|
Read more...
|
|

HASL operatives carried out installations of safe systems of work, replacement of corroded bolts, concrete cutting and removal, installation of water level markers by industrial rope access. | Type of Works | Area | Contract Period | | Installation of safety systems by rope access | Dam Wall | 3 Months | | Various rope access works | | | |
|
Read more...
|
|

HASL were contracted in to install 10,000 steel mesh panels by rope access techniques to the new multi-storey car park in Cambridge. Due to the close proximity to the railway lines rope access was the only option. | Type of Works | Area | Contract Period | | Steel fixing by rope access | 10,000 panels | 4 Months | |
|
Read more...
|
|
|